Concrete floor installation in Round Rock TX - a floor built on a solid base

Who installs concrete floors in Round Rock, TX?
Professional Round Rock Concrete Company installs concrete floors in Round Rock, TX, on a base that's dug out, packed and sloped to drain before any concrete shows up. I come out to look at the job myself, and our own crew does the work, from the groundwork through the pour and the cure.
Most floor calls start with a room, a shop or an old slab that's cracked and uneven. The work under it matters most, because the subgrade, the ground the slab sits on, has to be firm and drain away before we pour. Size and base work move the price most, the permit and the weather move the date, and your own figure comes from the estimate.
The base is the part you never see, and it's the first thing people want to cut when money's tight. I'd cut the finish before the base, because a slab is only as flat as what's under it, and a nice top on soft dirt still sinks. It's the same groundwork that goes under our concrete pool decks and concrete steps.
What a floor takes
- Topsoil and soft spots dug out
- Soil or fill packed firm
- Ground sloped so water drains
- Moisture sheet chosen for your covering
- Reinforcement set to keep cracks narrow
- Control joints cut on time
What to weigh before your concrete floor
What sets the price
Size comes first, then how much digging and fill the base needs, whether the slab is reinforced and the finish you want, so two floors the same size can price differently.
What sets the start date
The permit and the weather set the date, and we plan the pour for the cooler part of the day, because midday heat can leave a weak, dusty top.
Smooth or broom finish
A bare indoor floor usually gets a smooth troweled top that sweeps clean, while a broom finish, light grooves dragged across it, gives grip where the floor gets wet.
Concrete floor questions in Round Rock
How much does a concrete floor cost in Round Rock, TX?
A concrete slab or pad in Round Rock usually costs about $5 to $11 per square foot, before any staining or stamping. That's the going rate around here, not our quote, and a reinforced slab sits higher in that range than a plain pad. Your figure depends on the size and how much base work the ground needs, and I'll give it to you once I've seen the site.
Do I need a permit to install a concrete floor in Round Rock?
If the floor is part of a building or other structure, yes, because Round Rock requires a building permit for work on any building or structure, including in the Chandler Creek and Vista Oaks districts. For your exact project, the city's Development Technicians at 512-218-5550 can tell you whether you need one. Before we set a date, we check which office covers your address, and when a permit is needed we handle the application and keep it moving. We're licensed and fully insured, and the city only issues a permit once every contractor on the job is registered with it and named on the application. The permit lapses if work doesn't start within six months, so it pays to schedule the pour soon after it's issued.
Will my new concrete floor crack?
Some, yes, because all concrete tends to crack and a completely crack-free slab isn't possible. Wire mesh and other reinforcement can't stop it, but set at the right depth in the slab it keeps cracks narrow, so that's where we set ours. We also cut control joints on time, which are shallow grooves that give the slab a straight line to crack along, because a joint cut late lets the slab pick its own spot.
How long does a new concrete floor take to cure before I can walk on it?
You can usually walk on a new slab within 48 hours, but concrete takes 28 to 30 days to fully cure, which is the slow hardening that gives it strength. Many owners wait a week before putting heavier loads on it, just to be safe. National trade guidance says to keep the slab moist from the start with a sprayed curing compound or damp burlap for at least 3 days, because a slab that dries too fast ends up weaker.
What is the best way to keep moisture from coming up through a concrete floor?
A plastic vapor retarder, a sheet laid right against the underside of the slab, gives the most protection for floor coverings and coatings, according to national trade guidance. The catch is that a sheet directly under the slab greatly raises the chance of cracking, and the top can only be finished once all the bleed water, the water that rises to the surface, is gone. That's why I ask what's going over your floor first, since that decides how we handle the sheet, the reinforcement and the finishing.
What causes a new concrete floor to sink or crack early?
Usually a weak base, where the dirt was raked level instead of dug out and packed, so the slab settles right along with it. We take out the topsoil and soft spots, pack the soil or fill, and slope the ground so water runs away from the house instead of under the slab. Clay makes that groundwork matter more, since the Blackland Prairie clays that run from north of Dallas south to San Antonio shrink and swell a lot as they wet and dry.
Concrete floors near you
We're based in Round Rock and pour floors in many of the cities around it, including Georgetown and Pflugerville. Pick your area below, or call (512) 276-6396 if yours isn't listed.
Other concrete work
- Concrete driveway building
- Concrete patio construction
- Stamped concrete services
- Concrete sidewalk building
- Garage floor concrete
- Decorative concrete
- Concrete retaining walls
- Concrete pool decks
- Concrete steps construction
- Slab foundation building
- Foundation installation
- Concrete parking lot building
- Concrete footings
- Foundation raising
- Concrete cutting
Get a free estimate for your floor